Consultancy Services for the Conduct of Feasibility Study for Misamis Occidental Economic Zone Diversion Road (REXPRIP-29), Misamis Occidental 1st and 2nd Legislative District

Project Description

The Proposed project is a 2-lane, 93.70-kilometer road that will traverse the Municipalities of Bonifacio, Clarin, Tudela, Sinacaban, Jimenez, Panaon, Aloran, Lopez-Jaena, Palridel, Calamba and Sapang Dalaga, as well as the Cities of Tangub, Ozamis and Oroquieta, all in Misamis Occidental Province. The indicative alignment of the project starts at K1667+00 of the Ozamis – Pagadian Rd, S00957MN, and ends at K1797+106.5 of the Dipolog – Oroquieta National Rd, S01316MN, both national primary roads.

RELATED PROJECTS

Feasibility Studies/Preliminary & Detailed Engineering/Economic Analysis/Technical Studies/Traffic Impact Assessment for Aroroy Proper-Mataba Road, Masbate

Feasibility Studies/Preliminary and Detailed Engineering/Economic Analysis Negros Occidental Economic Highway (BANOCEH) Vicorias City to Sagay City, Negros Occidental

Consultancy Services for the Conduct of Pre-Feasibility Study/Geotechnical & Geological Survey/Investigation/Preliminary and Detailed Engineering for Padre Burgos Bypass, Agdangan Bypass Road and Bridge and Unisan Diversion Road, Province of Quezon

Consultancy Services for the Data Gathering, Surveys and Investigations for the Feasibility Study of the Proposed Construction of Puerto Princesa City Viaduct, Palawan

Consultancy Services for the Conduct of Feasibility with Highway and Bridge Detailed Engineering Design, Topographic Survey Bridge Site Survey, Sub Surface Soil Exploration Works & Geotechnical Investigation (Test Pit / CBR) for the Construction of Calamba – Los Banos- Bay Bypass Road, Laguna Province

Leading. Professional. Visionary. Excellent. Dedicated. Consulting since 1938. ALAI is ISO 9001:2015 QMS Certified.

Delivering innovative, sustainable solutions from concept to completion.