The bridge is composed of 4 structures, East and West Ramps, North and South bound flyovers with 52-spans PSCG, total length of 482.91m. The retrofit works are concrete shear keys, steel jackets, footing retrofit, cable restrainer, pedestal strengthening and repair of cracks.