Repair of the Cracks Developed and Construction of Wearing Course on the Deck of the Jamuna Multipurpose Bridge. The 4.80 km length bridge was constructed by Hyundai Engineering & Construction Co. JV (South Korea) under design and built contract in accordance with the Jamuna Contract Design Criteria (CDC) prepared by RPT NEDECO BCL, the consultant for the project.