Visual Examination, Documentation & Reporting of Faulty Concrete on Existing Viaduct & Stations on the Original Line-1 Mainline. The project was about the investigation & documentation of structural defects on any part or component of the ~14 km viaduct (including stations) that is essential to the stability that may be caused by faulty workmanship, use of defective materials or prolonged use which could be considered as threat to the safety of persons or property.
Feasibility, Design & Documentation for the Refurbishment of Parapets for the ~14 km LRT Line 1 Mainline. The project was about the development of a refurbishment/repair design to rectify the condition of the parapet walls on the existing LRT Line 1 mainline built in 1982. It included the preparation of conceptual means and methods along with a concept for the temporary works needed to support a work platform that will enable the refurbishment/repair to be safely undertaken during normal operating hours.